presentation
Benefits of foundation in the operational phase
Modeling and Simulation TWG Hsinchu Dec. 6, 2000 1 Modeling and Simulation TWG Paco Leon, Intel International TWG Members: I. Bork, Infineon E. Hall, Motorola.
DRAFT - NOT FOR PUBLICATION 14 July 2004 – ITRS Summer Conference PIDS Status and Key Issues: 2004 and 2005 ITRS Peter M. Zeitzoff for PIDS Technology.
The Most Common Mistakes Made in Parametric TestPage 1 Bill Verzi Automated Test Group February 24, 2005 Common Mistakes of Parametric Test… … and how.
© 2008 OSIsoft, Inc. | Company Confidential Helping People make the right decisions …….. when it matters! John C. Kapron Sr. Technical Specialist DTE Energy,
A Unified Approach for Modeling and Optimization of Energy, Makespan and Reliability for Scientific Workflows on Large-Scale Computing Infrastructures
Huawei ELTE2.3 System Reliability Prediction Technical White Paper
Relex Reliability Software “the intuitive solution!” Relex Software Corporation 1.
Accelerator Reliability Workshop – Cape Town 2011 L. Hardy – ESRF Operation Group1 A BRIEF HISTORY OF ACCELERATOR RELIABILITY.
Coverage-Based Testing Strategies and Reliability Modeling for Fault- Tolerant Software Systems Presented by: CAI Xia Supervisor: Prof. Michael R. Lyu.
DD2459 Software Reliability Karl Meinke [email protected] Lecture 1: Introduction.