LTU Site Report Dick Greenwood LTU Site Report Dick Greenwood Louisiana Tech University SW-USA TRACKER WORKSHOP University of Oklahoma January 15, 2007.
Hervé Lebbolo, François Rossel, Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 TOPICS: Main parameters of the Si-Envelope Front-End Issues: Long shaping.
Hybrid Active Pixel Sensors and SOI-Inspired Option M. Baranski, W. Kucewicz, S. Kuta, W. Machowski, H. Niemiec, M. Sapor University of Mining and Metallurgy,
CMS SLHC tracker, Feb 20071 1) some ideas on front end architectures for short strip readout concentrating mainly on power issues 2) outline of plans for.
07.10.2009, T. Tischler, CBM Collaboration Meeting, Split Status MVD Demonstrator: System Integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Self triggered readout of GEM in CBM J. Saini VECC, Kolkata.
KU PIRE
Hervé Lebbolo, François Rossel , Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 TOPICS:
WBS 2 - Hadron Calorimeter
A Fast Monolithic Active Pixel Sensor with in Pixel level Reset Noise Suppression and Binary Outputs for Charged Particle Detection Y.Degerli 1 (Member,
10 th November 2004Daniel Bowerman1 Dan Bowerman Imperial College Calice Meeting - UCL 10 th November 2004 Electronics Status For the Imperial, Manchester,
The RCU2 ALICE TPC readout electronics consolidation for Run 2