21/12/2006 Ron Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Planning 1 Status of the ILC, issues for the LCTPC design and their feedback.
09/11/2006 Ron Settles MPI-Munich/DESY Valencia ECFA WS Nov 2006 -- LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback.