Chapter 6
1 Audit Risk Week 10. 2 Risk Assessment in Planning AR = IR x CR x DR To meet desired level of Audit Risk Need to assess each component IR & CR can be.
By: Devi Sumadi - 26406016 The Administration information system design and construction of UD. Usaha Jaya Engineering Equipment Company.