GPS in Power Systems
Velodyne VLP-16 and HDL-32 Interface Box
Applications of Gps in Power Engineering
GL1280 Brochure e
Cosmic Cube Team Lead/Programmer: Kenneth Spradley Lead ECE: Matthew Gibson ECE Assistant: Don Lundi Lead ME: Cole Gray Financial Advisor: Crystal Hill.
Www.csiro.au The New GHz Pulsar Digital Filter Bank System Grant Hampson ATNF Research Engineer 23 November 2005.
Highly Scalable Packetised correlators Jason Manley CASPER workshop 2009.
Long-range Dependency Effects in Network Timekeeping
Cosmic Cube
June 26 th, 2007 SPSC Yves Déclais 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of installation.
ISUAL Test Verification Matrix H. Heetderks. TRR December, 20002NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Verification Matrix -- Imager Related.
AOS: Photon Calibrator Technical Status