All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks.
Rooftop Wind Turbine Greg Pawlus Biem Andrew Thon Matthew MacCormack Bryan MacDonald.
EECS 252 Graduate Computer Architecture Lec 9 – Precise Exceptions David Culler Electrical Engineering and Computer Sciences University of California,
Preparing For And Keeping Food Safe During A Power Outage.
CHAPTER Network Reliability: Fault Tolerance and Other Issues.
CERTIFIED PROFFESSIONAL CONTRACTS MANAGER (CPCM) TEST THE AUDIENCE !!
Safety Consideration Software limits on robot controller Limit switches on the robot “wrist” to prevent excess rotations Limit switches on the vertical.
CS252 Graduate Computer Architecture Lecture 5 Interrupts, Software Scheduling around Hazards February 1 st, 2012 John Kubiatowicz Electrical Engineering.
o Existing pipe designed for gravity outfall flow – peak storm flows raise pressures above design pressure o Single gasket joint every 12’ subject to.