Taming the Plasma Material Interface
1 NSTX Project Facility and Diagnostic Plan, 5-Year Plan Preparation and NSTX/NCSX Relationship Masa Ono NSTX PAC 21 st Meeting January 17 - 19, 2007 Supported.
Transient Tolerant Surface Development
Germantown, Maryland 6 APRIL 2000
Maintenance Scheme for Post-ITER Power Reactors
TF1: Physics integration for high performance RFP Proposals and discussion
Design window analysis of LHD-type Heliotron DEMO reactors
Impact of lithium-coated walls on plasma performance in the TJ-II Stellarator
Active Control of Neoclassical Tearing Modes toward Stationary High-Beta Plasmas in JT-60U
C.H. Skinner, H.W. Kugel, Princeton Plasma Physics Laboratory, J. T. Hogan, Oak Ridge National Laboratory, W.R Wampler, Sandia National Laboratories, and.