1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
FRONTEND DESIGN & OPTIMIZATION STUDIES HISHAM KAMAL SAYED BROOKHAVEN NATIONAL LABORATORY June 26, 2014 Collaboration: J. S. Berg - X. Ding - V.B. Graves.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam
The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment
Contents 2 J-PARC E19 Collaboration 3 Pentaquark search 4 Genuine exotic hadron (uudds bar ) M = ~1540 MeV/c 2 (decay KN) Situation is still controversial...
M. Bonesini - VC 18-12-081 TOF status M. Bonesini Sezione INFN Milano Bicocca.
Report from CALICE Beam Test 2 nd DAQ taking period and Plan for 3 rd DAQ period
TOF status M. Bonesini Sezione INFN Milano Bicocca
1 Probing Spin and Flavor Structures of the Nucleon with Hadron Beams Flavor and spin structures of the nucleons –Overview and recent results Future prospects.
Part II CP Violation in the SM