1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
MD#2 Summary (R. Assmann, F. Zimmermann, G. Papotti) MD#2 Summary Report 04/07/2011 Very satisfied with second MD: Some ground-breaking results path.
Alejandro G. Sosa a [email protected] ( BE-BI-PM ) WP 2 , ESR 3
MD#2 Summary (R. Assmann , F. Zimmermann, G. Papotti )
Friday 01/06
What are the issues with injecting unsafe beam into the LHC ?
IR1 and IR5 aperture at 3.5 TeV Preliminary results
Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report