ITER Technical Basis
Sonja Hillert, University of Oxford Simulation Software Meeting ~ DESY 28 June 2005 p. 0 Tools for optimising and assessing the performance of the vertex.
Vertex detector optimisation: status and strategies Introduction. Performance goals. Constraints due to machine and detector. Conceptual detector design.
UKHEP Forum, April 2004 Dan Tovey 1 Prospects for SUSY at ATLAS and CMS Dan Tovey University of Sheffield.
ATLAS Italia / CSN1 Referee – IBL G. Darbo – INFN / Genova Roma, 14 June 2010 o IBL Insertable B-Layer ATLAS Italia / Referee Roma, July 14 th 2010 G.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
R Frey SiD at SLAC 16Dec2011 1 DBD Planning: ECal LOI section still a good starting point Guiding principles based on optimizing physics performance constrained.
Status of the NIKHEF B Physics Program J. F.J. van den Brand [email protected] December 18, 2002 Prepared For: NIKHEF Annual Scientific Meeting.
A SUPPLEMENTAL FUSION-FISSION HYBRID PATH TO FUSION POWER DEVELOPMENT Presentation to EPRI Workshop on Fusion Energy Assessment Palo Alto, CA 7/21/2011.
10-Nov-06 GDE Valencia Global Design Effort 1 Road to Beijing and Beyond Barry Barish Caltech / GDE 10-Nov-06.
The Heavy-Ion Physics Programme with the ATLAS Detector & new results from WA98 Laurent Rosselet Cartigny, September 14 th 2007.
Design Parameters Sessions A1.1 and A2.1 Plenary Report C.Spiering VLVNT Workshop Amsterdam October 2003.