Simulation of transition crossing in the Fermilab Booster Xi Yang
CSR calculation in ERL merger section Tsukasa Miyajima KEK, High Energy Accelerator Research Organization 8 November, 2010, 13:30 Mini Workshop on CSR.
1 st dipole band
1 Simulation of transition crossing in the Fermilab Booster Xi Yang September 5, 2006 Xi Yang the work has been done in collaboration with Alexandr Drozhdin.
CSR calculation in ERL merger section