R. Ostojic CERN, AT Department. R. Ostojic, LTC, 10 May 2006 2 LHC Insertion Magnets Dispersion suppressor Matching sectionSeparation dipoles Final focus.
CAS June 20081 Stored energy and risks Failures Protection systems Beam Instrumentation Case studies Conclusions Machine Protection Rüdiger Schmidt CAS.
NORMAL CONDUCTING MAGNETS AND POWER SUPPLY FOR FAIR – ICPE- CA PARTICIPATION TO THE IN-KIND CONTRIBUTION OF ROMANIA INCDIE ICPE-CA, Bucharest, October.
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 NuFact02@CERN Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
Machine Interlocks in the Injectors MPE-TMB. Puccio & al.25 th Aug. 2011 1v0.
NUSTAR 4: Ion-optical studies and applications
Rüdiger Schmidt1 The LHC collider project II Rüdiger Schmidt - CERN SUSSP Sumer School St.Andrews Challenges LHC accelerator physics LHC technology Operation.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Lectures at NIKHEF (10.12.2008)
R. Ostojic CERN, AT Department
Ongoing consolidation of magnets
T hanks to Benjamin Todd & Markus Zerlauth
JHF2K neutrino beam line