Now2008 Paola Sala for the CNGS SBWG CNGS status Paola Sala, INFN Milano on behalf of the CNGS Secondary beam working group.
Evian 2012 : Session 3 - Beam Based Systems and Control: 2012 performance and 2014 outlook Delphine Jacquet on behalf of the operation team What we want.
LHC Technical Committee, 07/03/2007 LHC Commissioning Phases Commissioning injection and first turn presented by B.Goddard Summary of considerable efforts.
Performance and Operational Experience of the CNGS Facility Edda GSCHWENDTNER, Dario AUTIERO, Karel CORNELIS, Ilias EFTHYMIOPOULOS, Alfredo FERRARI, Alberto.
CNGS Operation Results 2008 Edda Gschwendtner AB/ATB on behalf of the CNGS team.
Name Event Date Name Event Date 1 SLHC Machine Plans We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
Overview of Machine Protection for the LHC 1 J. Wenninger CERN AB Department / Operations Group Experiments-Machine WS / June 07 With input from many colleagues.
RWA, EPAC06 The LHC Collimation System R. Assmann, CERN/AB for the LHC Collimation Team EPAC 2006 Edinburgh.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
The CNGS Facility: Performance and Operational Experience Edda GSCHWENDTNER, Karel CORNELIS, Ilias EFTHYMIOPOULOS, Alfredo FERRARI, Ans PARDONS, Heinz.
Feasibility studies of open charm reconstruction with pile up 1. General simulations with pile up 2. Open charm reconstruction Christina Dritsa Outline: