1 Subproject HADES 2 Forward Wall FP6 Meeting September 26, 2006.
AIDA Infrastructure for very forward calorimeters Mechanical design adapted to the existing electronics 6/09/2011 Designers:In collaboration with: Eric.
AIDA Infrastructure for very forward calorimeters