Ultimate Storage Rings PEP-X and SPring-8 II R. Hettel for the PEP-X design team and T. Watanabe et al., SPring-8 FLS 2012 JNAL March 7, 2012.
‘Characterization of a Non-linear Kicker at BESSY II’ O. Dressler, P. Kuske Advanced Low Emittance Rings Technology Workshop, Valencia, Spain, 5 - 6 May.
H.J.Specht, Erice 2012 Future options for the CERN SPS Erice, 20 September 2012 Hans J. Specht Physikalisches Institut Universität Heidelberg 1.
‘Single Non-linear Kicker for Top-Up Injection at BESSY II’
‘Single Non-linear Kicker for Top-Up Injection at BESSY II’ O. Dressler, P. Kuske - Low Emittance Ring 2013 Workshop, Oxford, UK, July 8 - 10.
- Onset of deconfinement
Summary Tuesday 24.8.
Future options for the CERN SPS