11.bicriteria in constrained n x 0003 call for paper flow shop to minimize the rental cost, setup time, processing time
11.minimizing rental cost for n jobs, 0002 call for-paper-machines flow shop scheduling, processing time associated with probabilities
Chapter 15: Production Scheduling TM 663 Operations Planning November 28,2011 Paula Jensen.
Jobshop scheduling. We have a set of resources a set of jobs a job is a sequence of operations/activities sequence the activities on the resources.
11.Minimizing Rental Cost for n-Jobs, 0002 Call_for_Paper-Machines Flow Shop Scheduling