Heliox in the Hospital - Pilbeam
LHC 14 & 15 April 2015 9:22: Ramp to 6.5 TeV lost due to MUFO, resulting in quench 10:30: Access during cryo recovery 16:00: Pre-cycle 17:05: RB.A78 short.
1 Where to Search for the Higgs A direct search for the Higgs was carried out by the four LEP experiments from 1995-2000 CMS energy of 205-208 GeV The.
Sunday 17.04 03:00 injection 336 bunches, ramp, squeeze luminosity. 03:19 Stable beams #1718. Duration: 9h08. Peak lumi ATLAS/CMS: 3.8/3.6e32. Int.
Martin Wilson Lecture 5 slide1 JUAS February 2012 Lecture 5: Practical matters Plan LHC quench protection current leads accelerator coil winding and curing.
Lessons from LHC He Release and R2E
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
Position stability and monitoring in ATLAS
LHC diodes: Status report (for information) A. Verweij, TE-MPE, Splice review, 29/11/2011 Arjan Verweij, TE-MPE With input from many people involved in.
Position stability and monitoring in ATLAS Georg Viehhauser with input from Steve McMahon, Anthony Morley, Pawel Bruckman, Andreas Salzburger, Eric Anderssen.
1 Reliability and Availability of the Large Hadron Collider (LHC) MachineProtection System Jan Uythoven CERN, Geneva, Switzerland Thanks to R. Schmidt,
Machine Protection and Required Availability in view of the HL-LHC goals