Commissioning of the FPGA-Based Transverse and Longitudinal Bunch-by-Bunch Feedback System for Taiwan Light Source Kuo-Tung Hsu on behalf of the feedback.
1 KEKB Status and Upgrade Plan with Crab Crossing Second Electron-Ion Collider Workshop March 16,2004 Mika Masuzawa, KEK.
Status of the accelerator upgrade Dec.10 2008 Mika Masuzawa mm 12/10/2008.
10 36 ??? 20 Apr. 2005 K. Oide (KEK) @ Super B Workshop.
FR NSLS II Beam Stability Workshop, April 2007 High Frequency Beam Effects at the ESRFJ. Jacob, slide 1 J. Jacob NSLS II Beam Stability Workshop BNL, April.
KEKB Status and Upgrade Plan with Crab Crossing
BIW06, FNAL, May 1~4, 2006
High Frequency Beam Effects at the ESRF