1 Retiming and Re-synthesis Outline: RetimingRetiming Retiming and Resynthesis (RnR)Retiming and Resynthesis (RnR) Resynthesis of PipelinesResynthesis.
Retiming and Re-synthesis
ECE 667 Spring 2013 Synthesis and Verification of Digital Systems
ECE 667 - Synthesis & Verification 1 ECE 667 ECE 667 Synthesis and Verification of Digital Systems Retiming.