Optimisation of Roebel cable for HTS accelerator magnets Jerome Fleiter and Amalia Ballarino on the behalf of EuCARD 2 WP10.2 1 EuCARD-2 is co-funded by.
A Review of Open Midplane Dipole Design Study
LHC Beam Diagnostics The(a) user’s point of view
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
SL Seminar 11 July 20021 Machine Protection and Interlock Systems for the LHC SL-Seminar Rüdiger Schmidt on behalf of the MPWG The LHC challenges Powering.
High Field Magnet R&D with YBCO