Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Transmission Expansion Kansas Wind and Renewable Energy Conference Topeka, KS September 23, 2008.
Power cables and conductors
DANVERS ELECTRIC DIVISION Presented by: Hamid Jaffari, Director of Engineering and Operations.