Splices in 13 kA circuits status of an ongoing work just started
1 Quality control of the LHC main interconnection splices before and after consolidation C. Scheuerlein and S. Heck 2 nd LHC splice review, 28.11.2011.
MPE actions from last review and circuits screening
MPE actions: update Third LHC Splice Review, November 12-14, 2012 Rüdiger Schmidt, TE-MPE reporting for ….. Circuit Documentation: S.Pemberton, K.Pereira.
Quality control of LHC electrical interconnections to be produced during the 2009 shutdown Since the functional properties of the LHC electrical interconnections.