17 th ADAS Workshop, Cadarache, France 2012 Page 1 Progress in ITER Diagnostics Michael Walsh and the ITER Diagnostics Team (IO Diagnostics, all DAs and.
1 R. Doerner, ARIES HHF Workshop, Dec.11, 2008 PMI issues beyond ITER Presented by R. Doerner University of California in San Diego Special thanks to J.
1 ITER Test Blanket Module (TBM) Current U.S. Designs, Plans, Issues, and Material R&D Needs Prepared by: Presented at the MASCO meeting Washington DC,
1 Mohamed Abdou With input from M. Sawan (UW), D. Sze (UCSD), N. Morley (UCLA), C. Wong (GA), S. Willms (LANL), A.Ying (UCLA), R. Nygren (SNL), P. Fogarty.
1 VLT Research Highlights ITER Test Blanket Module (TBM) M. Abdou and the ITER-TBM Team Outline 1.Introduction and TBWG activities 2.Technical planning.
VLT Research Highlights ITER Test Blanket Module (TBM)