Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
Eric Prebys USPAS, Knoxville, TN, Jan. 20- 31, 2014.
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, 2008 2008 Neutrino Factory and Muon Collider Collaboration meeting Sergei.
Recent Studies on ILC BDS and MERIT
Special Topic: A Few Tricks of the Trade