1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Y. R. Roblin, G2P review, 1/17/2011 2011 HALLA G2P readiness review Yves Roblin, CASA.
BVIT: An imaging, photon counter for high time resolution astronomy on SALT Jason McPhate, Oswald Siegmund, Barry Welsh, John Vallerga, Doug Rogers (Univ.
TF Joint Operations Review Introduction C Neumeyer 2/10/05 Scope and Outline of Review Summary of Findings from 2004 Run Review of Joint Force, Pressure.
Extended LTC 3-3-2008 CERNMassimiliano Ferro-Luzzi 1 Experiments during HWC, beam tests and initial commissioning What are the experiments going to do.
i2533
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
How to reach the required availability of LHC to reach the required level? Mike Lamont 30 th October 2013 1 Squeezing out the ab -1 s Thanks for input:
LHC Performance Workshop - Chamonix 2009 3 February 2009 Jim Strait Fermilab Risk Analysis for the Different Consolidation Proposals.
Very Cold Moderator Development at LENS
The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment
CompAir D_DRS Series Operations Manual Rev.02 Nov.11, 2013