R Scrivens, D Kuchler, IEFC Workshop 2011. Schedule and Performance The Source Other Linac Issues (not exhaustive) New ions Final remarks 1.
LHCb Upgrade Beampipe Supports
PSB Half-Sector and Stripping Foil Test in L4T
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
IEFC workshop 2011 Session 6 (Thursday 24 March, 2011)
Installation and Commissioning of the PS Personnel Safety System PS PSS Eva Sanchez-Corral GS-ASE On behalf of the PS Access Team Boris Morand, Christophe.
LINAC-4 Ion Source Review Pumping Systems Paolo Chiggiato, Chiara Pasquino, Giovanna Vandoni Technology Department Vacuum, Surfaces and Coatings Group.
Towards smooth operations for the SPS North Area that remains as popular as ever IEFC Workshop 2010 A. Masi, Towards smooth operations for the SPS North.
Secondary Beams and Areas: Status and Plans
Linac3 and GTS-LHC ion source
Maurice Glaser, Michael Moll