UAS Control and Non Payload Communications (CNPC) Link Availability ICAO ACP-WG-F Meeting #24 Paris, March 2011 Michael Neale and Brooks Cressman.
CPDLC Sweden – ATN/IPS based Point to Point communications Purpose, Functionality, Carry out, Goals and Value Presented at ICAO ACP WG-I 10-05-19 By Robin.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
FAA 19th Annual FAA/JAA International Conference Required Navigation Performance (RNP), Area Navigation (RNAV) Implementation Mr. Hooper Harris FAA/JAA.
Continuous Descent Operations ( CDO )
Presented at ICAO ACP WG-I 10-05-19 By Robin Hughes
Aerodrome Certification Exercise The Process Reference: ICAO Manual on Certification of Aerodromes, Chapter 4 – Aerodrome Certification Procedures ICAO.
Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide view