B.Satyanarayana, TIFR, Mumbai INO Collaboration. B.Satyanarayana BARC-TIFR INO meeting, TIFR, Mumbai November 9, 20122.
PASS Portfolio - Presentation (1).pdf
Copy of 8BK80
1 Gas processes in OTP straw Questions: HV limit SQS mode Gas gain ??? Location- O:\Data\Osotr1\Presentation3.ppt and O:\Data\Osotr1\chargestudy.ps V.
Status of the LHCb RPC detector Changes with respect to Note 2000-053 6 cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
ICHEP – Beijing, China Aug 16-22, 2004Professor Priscilla Cushman, University of Minnesota Performance of the multi-channel Hybrid Photodiodes for the.
HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008.
HBD HV Control and Monitoring System
IEEE Nuclear Science Symposium Nov. 8 2001, San Diego, CA Professor Priscilla Cushman University of Minnesota Problems and Solutions in high-rate multi-channel.
Construction and Operation of DHCAL prototype @ Fermilab Test Beam Facility Lei Xia ANL_HEP.
Strip Module Working Group Meeting 16 th May 2012 Hybrids A Greenall