W. Bayer – ABI Workshop, Bad KreuznachEmittance measurements at GSI UNILAC11. Dez. 2008 Emittance Measurement at GSI UNILAC – Results and Requirements.
IDM2004 G. Gerbier LSM - Fréjus underground sites status and projects Gilles Gerbier CEA/Saclay - LSM.
Laser in prosthodontics History
Overview of Beam Interlocking MP ReviewB.PUCCIO & B. TODD6-8 th Sept. 2010 0v3.
Status of a Cryogenic System for J-PARC Neutrino - Availability, Tritium creation, Volatilization of the ammonia etc. - KEK : Y. Makida, H. Ohata, O. Araoka,
Planar Edgeless Silicon Detectors for the TOTEM Experiment 1.E-09 1.E-06 1.E-03 3.43.94.44.9 1/T, 1e3/K Current, A (294K) (256K)(227K)(204K) Gennaro Ruggiero,
4th July, 2002NuFact 2002 Workshop at Imperial College, London Possibility on a point positive muon source for a neutrino factory by laser excitation of.
OFFICE OF SCIENCE Review Closeout for the Long Baseline Neutrino Experiment (LBNE) Project at Fermi National Accelerator Laboratory November 1, 2012 Daniel.
FNAL Target Related Capabilities PASI 2013 Working Group 1 P. Hurh (FNAL)
F. Pellemoine PASI Workshop - April 3-5, 2013 Capabilities of NSCL - FRIB.
1 CORRECTION I said yesterday that ceramic coating of conductor pipe is not broken up to 1mm/m bending … It is not exactly. I have not bended a ceramic-coated.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.