Introduction to CLIC and breakdown in rf structures W. Wuensch Breakdown physics workshop 6-5-2010.
Fifth International Linear Collider SchoolW. Wuensch 30 October 2010 Room Temperature rf High Gradients: Physics, rf design and Technology When Maxwell’s.
BE-KT Innovation Day Octopus Temperature Mapping System for Cavity Diagnostics Kitty Liao BE-RF-SRF [email protected] 3 June 2012 BE-KT Innovation Day.
Estimates of Radiation Levels in the Main Linac Tunnel and Beam Dump Caverns for the CLIC Design Study Sophie Mallows, Thomas Otto 03.6.2010SATIF 10, S.
Overview
The R&D programme on Normal Conducting Linacs (NCLinac)
BE-KT Innovation Day Octopus Temperature Mapping System for Cavity Diagnostics
Sophie Mallows, Thomas Otto