Hull form geometry
Laporan Design 1 Rencana Garis (English)
Chs Ship Construction
7-Chapter 2 Text 2011
SHIPS, SHIP ROUTINE AND CONSTRACTION 1. The opening in the deck beneath the anchor windlass that leads to the chain locker is the: A.hawse pipe B. spill.