ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
SC Technologies for the Next Generation of Accelerators| 2012-12-05 | Christine Darve The ESS Cryomodules 2012 December, 5 th Christine Darve Cryomodules.
1 Outline: Motivation Design and Construction Operation and Performance Tracking results The Straw-Tube Tracker of the ZEUS Detector at HERA Stefan.
Laser-Plasma Acceleration in Sweden
The ESS Cryomodules 2012 December, 5 th Christine Darve