LHC Status and CERNs future plans Lyn Evans. L. Evans – EDMS document no. 859415 2 Machine layout.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
Beam Instability Workshop, ESRF, 13th - 15th March 2000J. Jacob / 1 Harmonic Cavities:the Pros & Cons Jörn Jacob.
UPDATE OF POSITRON PRODUCTION CODE KONN
BDS optics and minimal machine study
January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January 8-11 2007, Daresbury.
Operational Status of CESR-c
Operational Status of CESR-c James A. Crittenden Accelerator Physics Seminar Wilson Lab 28 July 2006.
Higgs Searches beyond the Standard Model at LHC (and at the B-factories) Michael Kobel TU Dresden DESY Seminars 26.6./27.6.2007.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
ILC Beam Delivery System “Hybrid” Layout 2006e Release