Gas Fire Installation and Maint
Sime RX Range Installation Manual
AUX BLR
Expansion Joints
Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)
Routine Test Procedure
L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations.
Abstract
ca_hd4(en)m_1vcp000004-0901a.pdf
L. Pontecorvo
Straw-tubes
1 HBD Update Itzhak Tserruya DC Upgrades meeting HBD, BNL, July 13, 2005 Prototypes Full scale HBD Readout board FEM Final detector HBD Design.