Wednesday 24.11. ● 02h04: Stable beams #1514. 121b x 121b. – Peak luminosity 1.2e25 cm-2 s-1 ● 08h32: Beams dumped on request. – Length=6h28. Rampdown.
Tuesday
Friday 26.11.
Very Preliminary proton MD summary G. Arduini – BE/ABP
Tuesday 17.8.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
LHC Instrumentation Status and Challenges
Wednesday 24.11.