The MAX-lab facility Glasgow September 2008 BS 1.
Septa Magnets Modeling Measuring and Performance Nick Tsoupas Brookhaven National Laboratory.
Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
EMMA Design and Construction Bruno Muratori STFC, Daresbury Laboratory 21/01/09.
Muon Acceleration in Non-Scaling FFAG f or the Neutrino Factory
Saturday 2/4/2011
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
Niels Pyka, FAIR Synchrotrons SIS300 Preconsortium Meeting @ Protvino, March 19th 2009 SIS300 lattice and main required parameters of the magnets.
The MAX-lab facility
FCC-hh INJECTION AND EXTRACTION Wolfgang Bartmann, CERN with many inputs from M. Atanasov, M.J. Barnes, J. Borburgh, T. Fowler, B. Goddard, W. Herr, T.
Saturday 1.12.