Luhri_Hep
POWERGRID NORTHERN REGONAL LOAD DESPATCH CENTRE SUBMISSION IN RESPECT OF PETITION NO. 35/2003 DATED 30.09.2003.
9/8/2015 ERLDC: POSOCO 1 Grant of Connectivity,LTA, MTOA In Interstate Transmission system Regulation 2009 P.S.Das, Ch.Manager ERLDC, POSOCO.
DEVELOPMENT OF SOUTH ASIAN GRID. WHY SOUTH ASIAN GRID ? Optimal Utilization of Natural Resources Opportunity of Energy Trading Economy of Scale Advantage.
11/3/2015 NRLDC: POSOCO 1 Grant of Connectivity,LTA, MTOA In Interstate Transmission system CERC Regulation 2009 D.K.JAIN, DGM NRLDC, POSOCO.
12/20/2015 NRLDC: POSOCO 1 Grant of Connectivity,LTA, MTOA In Interstate Transmission system Regulation 2009 H K CHAWLA, DGM NRLDC, POSOCO.
Grant of Connectivity,LTA , MTOA In Interstate Transmission system Regulation 2009
Grant of Connectivity,LTA, MTOA In Interstate Transmission system Regulation 2009
12/12/2015 ERLDC: POSOCO 1 Grant of Connectivity,LTA, MTOA In Interstate Transmission system Regulation 2009 P. Mukhopadhyay ERLDC, POSOCO.
RFQ_Kudgi
DEVELOPMENT OF SOUTH ASIAN GRID