CEE 422 Construction, Cost Analysis. Prof. Ibrahim Odeh University of Illinois, Urbana – Champaign. Fall 09. Ayuss S. Kumar Accuracy of Construction Cost.
Multilevel Modeling: Why, When and How? Frank Dong 1-9-2013.
Chapter 10 Estimating Means and Proportions Stat-Slide-Show, Copyright 1994-95 by Quant Systems Inc.
International Approach to Predicting Construction Labour Hours
Budget and Scheduling Factors Influencing the Quality of Estimates Acquired experience is the best guide in predicting costs.
CC 23 Capital Cost Rev 8.1