PSB Beam Dump Cooling Radiation WG Glen Mason EN-CV 25 June 2013.
SC cavity design and manufacturing
Organization, Projects and Activity Forecast 2012 Oliver Böttcher, 29 th of March 2012 EN-HE-HM Handling Maintenance Section at CERN.
LHC Cryogenics Schneider PLCs: Radiation tests at H4IRRAD Mitigation measures
Interventions for LS1
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
Safety during LS1 EN-STI Group meeting 1st February 2013 AP.Bernardes EN/STI.
FOLLOW UP MEETING - TIDVG 3 - Thermo-mechanical study for future beams
LSC 30/08/13
112/09/2013. Summary Events on the network Incidents Network reconfigurations Network operation Update on activities Tests Projects and.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.