Project Scheduling 1. Why Are Projects Late? An unrealistic deadline established by someone outside the software development group Changing customer requirements.
Developed by Reneta Barneva, SUNY Fredonia User Interface Design (Chapter 11)
ﴀ These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.
Developed by Reneta Barneva, SUNY Fredonia for CSIT 425 Requirements Modeling.
SE Lecture4 Ch5-6 Req
SE Lecture1 Ch1 Software and SW Engineering
1Coming up: Project Risks Chapter 28 – Modified by Fleck Risk Analysis Slide Set to accompany Software Engineering: A Practitioner’s Approach, 7/e by Roger.
Risk Analysis 1. Project Risks 2 What can go wrong? What is the likelihood? What will the damage be? What can we do about it? Check : List of potential.
The Code and Fix model It is a simple two phase model. In first phase: code is developed
Module 8: Software Evolution CSEB233 Fundamentals of Software Engineering Badariah Solemon 2010.
November 3, 2015 Embry Riddle Prescott Team #TBD Member1, Member2, Member3, Member4 [Alphabetical] Real-Time Systems Software Proof-of- Concept [12+
Module: Software Engineering of Web Applications Chapter 2: Technologies 1.