GridPP Status David Britton, 3/Sep/08.. 2 31/03/2014 Switching on the LHC The LHC was fully cold by mid August. This is being followed by continued powering.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Oversight Committee Meeting.
1 LHCb on the Grid A Tale of many Migrations Raja Nandakumar.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
RAL Tier1 Operations Andrew Sansum 18 th April 2012.
12th September 2002Tim Adye1 RAL Tier A Tim Adye Rutherford Appleton Laboratory BaBar Collaboration Meeting Imperial College, London 12 th September 2002.
Geoff Quigley, Stephen Childs and Brian Coghlan Trinity College Dublin.
ELFms status and deployment, 25/5/2004 ELFms, status, deployment Germán Cancio for CERN IT/FIO HEPiX spring 2004 Edinburgh 25/5/2004.
T. Bowcock A.Moreton, M.McCubbin CERN-IT 5/00. 29 May 2000CERN-IT T. Bowcock2 University of Liverpool MAP System COMPASS Grid Summary.
Building a High Performance Mass Storage System for Tier1 LHC site Vladimir Sapunenko, INFN-CNAF GRID2012, July 16 – 21 Dubna, Russia.
CGW03, Crakow, 28 October 2003 DataTAG Project Update CGW’2003 workshop, Crakow (Poland) October 28, 2003 Olivier Martin, CERN, Switzerland.
Lxcloud