Data Acquisition Issues at the International Linear Collider Front End Readout Issues ● Large channel counts require low power consumption power cycling.
SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.
Software Overview David Lawrence, JLab Oct. 26, 2007 David Lawrence, JLab Oct. 26, 2007.
Mokka, main guidelines and future
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Full Event Reconstruction in Java CHEP '04 Interlaken, Switzerland Sep. 30, 2004 Norman Graf (SLAC) for the LCD development team (“From 0 to analysis in.
Full Event Reconstruction in Java
Alain Blondel TLEP VC 2013-11-18 TLEP Design Study News.
Project Overview
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
Elements of U.S. Bid to host the ILC R. Kephart (+ H Padamsee )
Muon Detectors: Challenges at High Luminosity