Zeuthen, 23.04.2013 Computing Seminar Volker Gülzow, Kars Ohrenberg Networking@desy.
Power Losses due to Button and Reentrant BPMs Igor Zagorodnov and Dirk Lipka 01.10.07 BD meeting, DESY.
20th RD50 workshop Bari May 2012 Life time determination of free charge carriers in irradiated silicon sensors Thomas Poehlsen, Doris Eckstein*, Joachim.
CSS at ITER, 3-June-2010, EPICS Collaboration Meeting Aix-en-Provence Page 1 Control System Studio (CSS) At ITER…
7/10/2004Erika Garutti1 The FLC Group (Future Linear Collider) oder ( Forschung an Lepton Collidern) Erika Garutti.
Recent progress in hadron physics -From hadrons to quark and gluon- 2013 Feb. 18-22, Yonsei University 1. Photon propagation in strong magnetic field:
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June 14 2006 F. Willeke, DESY.
The Users Perspective on control systems (some truisms) Heiko Ehrlichmann, DESY.
Alexander Krieg (DESY-IT) - HEPiX Spring 2008 - Indico@DESY 8. May 2008 1 Indico@DESY.
July 2006ALCWS Vancouver Very Forward Instrumentation of the Linear Collider Detector On behalf of the Wolfgang Lohmann, DESY.
FLASH. Free-Electron Laser in Hamburg Lessons from FLASH FLASH Upgrade FLASH II Lessons Siegfried Schreiber DESY FLS 2010 SLAC 1-6 March 2010.
Managed by UT-Battelle for the Department of Energy CSS Update Matthias Clausen, Helge Rickens, Jan Hatje and more @ DESY Delphy Armstrong, Xihui Chen,