4/29/2005Talk Presented at SMTF Collaboration Meeting 1 Fermilab ILC R&D Status and Plan (Superconducting RF) Shekhar Mishra Fermilab.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
Our way to the CLIC CDR 1.Definition of CDR and TDR 2.CLIC feasibility items 3.Organization of technical preparation - CTC (=CLIC technical committee)
ILC R&D at Fermilab Overview (Main Linac and Superconducting RF)
5/10/2005AAC Review, Fermilab1 ILC R&D at Fermilab Overview (Main Linac and Superconducting RF) Shekhar Mishra Fermilab.
Slide 1 JLAMP Proposed 4 th Generation Soft X-ray Light Source Tom Powers, for the JLAB Team May 6, 2009.
Status of CTF3 Feasibility Studies Experimental program in 2010, 2011
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
CTF3 & CLIC Parameters Instrumentation already developed What will be done in the CLEX
The Neutrino Factory and Muon Collider Collaboration R&D Program and Participation in the IDS.
NCRF R&D Programs and Plans
LHC-4R crab cavity