Cockcroft Institute P. Goudket Cockcroft All Hands Meeting - March 2007 ILC Crab Cavity Collaboration Amplitude and Phase Control Development Cockcroft.
Solutions Through Applied Technology AOT Gun Advanced Modular Gun Large-Caliber High Velocity Launcher Redefining – Faster Than A Speeding Bullet Presented.
Microwave - Experiment 5 - Coupler Design
805-MHz Cavity Refurbishment and suggestions on future tests Derun Li and Robert Rimmer*
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-19
Preparing for SCRF Meeting to be held at Fermilab, April 21-25
Update on LHC 800MHz Crab Cavity Conceptual Design
The Frascati C-band structure and the high-power test of the cavity at KEK B. Spataro (LNF-INFN, Frascati, Italy) on behalf of the SPARC/X C-Band group.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
D. Li and R. Rimmer, RF Workshop, Fermilab, 10-15-2008 805-MHz Cavity Refurbishment and suggestions on future tests Derun Li and Robert Rimmer* Lawrence.
The Frascati C-band structure and the high-power test of the cavity at KEK
High Power Couplers and… pushing the limits of SC cavities