IR Beamline and Sync Radiation
LHC progress with beam & plans
Sat/Sun 26/27 th March
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
IR Beamline and Sync Radiation Takashi Maruyama. Collimation No beam loss within 400 m of IP Muon background can be acceptable. No sync radiations directly.
MD Planning Fri – Sat (1. – 2.7.)
Beam parameters and machine performance to be reached in 2010