HVAC
H.-G. Moser Max-Planck-Institut für Physik MPI Semiconductor Laboratory (Halbleiterlabor: HLL) Common project of the: Max-Planck-Institut fuer Physik (Werner.
Microfluidics Mixing Chamber. 1.Where? / With Whom? 2.Intro to Project 3.Proposal 4.How?
1. Preparation of larger parts in a Clean room Class 10000 (ISO7) Preparation of smaller parts in a “baldaquin” annex Assembly in a clean-room Class.
Superconducting RF Cavity/Cryomodule Development at Fermilab (Industrialization) C.M. Ginsburg (FNAL) Proton Accelerators for Science and Innovation 2.
Adept Quattro s650H robot Todd Reynolds Applications Engineer April 3, 2009.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
Surface study at KEK 1) sponge cleaning 2) special single-cell cavity with de-toutchable Nb-samples T. Saeki on behalf of Jlab-FNAL-KEK S0 study collaboration.
The SPL Short Cryo-module: Status Report (outcome of the conceptual review) V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team 1 st Open.
Biosigma - Depliant 2010
Depliant Biosigma - 2011
© iC-Málaga S.L. – Integrated Circuits Corporate Profile 2013.