Revit MEP
Interior Finishes: Part Two Finish Ceilings and Floors.
Wireless Equipment Installation Inside Last Update 2013.10.31 1.7.0 Copyright 2005-2013 Kenneth M. Chipps Ph.D. 1.
1. DHEC Disturbance of ACBM during renovations and demolitions Focus on environmental impact OSHA Disturbance of ACM during renovations, demolition, maintenance.
Unit 9 Finishes Teaching Objectives 1. Have basic idea of finishes 2. Understanding something about wall finishes, floor finishes and ceiling finishes.
Acoustic Panels by Soundtect 2014
Soundtect Acoustic Panels - An Introduction
Mfsc2
Leica 3D Disto
Soundtect Acoustic Panels presentation 2014
Participació amb el Beauty Cluster Barcelona a In-cosmetics 2015
Design and analysis of car bumper