KEKB Commissioning with crab cavities Y. Funakoshi for KEKB Commissioning Group 2008. Dec. 8.
Isabell-A. Melzer-Pellmann ILC-tech meeting, 24.8.2006 Status report of offset and angle studies with Guinea-Pig Status report of offset and angle studies.
The IR lattice design and optimization of the dynamic aperture for the ring Yiwei Wang, Huiping Geng, Yuan Zhang, Sha Bai, Dou Wang, Tianjian, Jie Gao.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii 20-23 Apr. 2005.
Collision with a crossing angle Large Piwinski angle
Partial summary of WG3 M. Sullivan and Y. Funakoshi.
Beam beam simulations with disruption (work in progress...)
LARP Accelerator Physics
Next KEK machine Shoji Hashimoto (KEK) @ 3 rd ILFT Network Workshop at Jefferson Lab., Oct. 3-6, 2005.
Beam-beam Simulation at eRHIC