Muon Collider Lattice Design FERMI NATIONAL ACCELERATOR LABORATORY US DEPARTMENT OF ENERGY f Yuri Alexahin, Eliana Gianfelice-Wendt (Accelerator Physics.
Super flat IR beam pipe Super B Factory WS in Hawaii Jan. 22, 2004 Hidekazu Kakuno (TIT) Hitoshi Ozaki & Nobu Katayama (KEK)
Accelerator Summary 1/22/2004 K. Oide (KEK). Accelerator Session: PEP-II IR Upgrade M. Sullivan (SLAC) Super KEKB Optics & IR Y. Ohnishi(KEK) Super-PEP-II.
Status on SuperB effort
LHC Operation Week 41
Muon Collider Lattice Design
Vacuum status at KEKB
Progress of ILPS in 2006 D. Schulte. Remarks Activity report –Not enough time to really discuss results –Many studies are being finalised for EPAC or.
Accelerator Summary
Status with LHC Beam